As the construction industry moves to the future to
accomplish complex projects, it is extremely vital for construction engineering
firms or companies to provide top-notch BIM
Preconstruction Services for building owners.
In the beginning it was just 2D drawings or 2D geometry, but through constant
innovation in the field of AEC & construction engineering, BIM has gained
significant value through its processes based on 4D scheduling and 5D
cost estimation.
The use of information-rich 3D models in the
construction mix has been well established through state-of-the-art project
visualization, scheduling and cost-estimation. Global AEC firms are breaking
the barrier to leverage these various BIM barriers and provide affordable BIM
project management services
for
BIM Construction Project Management.
These firms are constantly working with clients to build processes or services
for the ever-changing AEC industry and client requirements. This can be
achieved through BIM Preconstruction Services that are backed by 4D scheduling and 5D cost estimation.
Data is the key to all new and existing projects, a
good BIM project management company can
drive significant benefits based on high-quality 3D modeling, precise
information architecture, and BIM
Coordination, and more. When teams are well connected and coordinated,
it makes the complete building process easier to execute wherein commercial and
time-based decisions can be made with greater accuracy.
This leads to an efficient way of bringing people
and teams that involves architects, planners, surveyors, etc. that creates a
common data environment through standardization of data models and handover of
file formats in the form COBie.
5D
cost estimation adds immediate business profits
through planned economics, it encapsulates all the previous levels of BIM and
dimensions viz. 3D modeling & 4D scheduling. It creates a robust business
purview that integrates scheduling and cost management into the project mix.
Getting the cost aspect in the picture aligns the
complete project in favor of BIM, that drives enhanced performance, workforce
productivity, greater sustainability & facilities management
after on-site construction is done and complete for occupants to live in.
With the adoption of 5D BIM, the extent of Preconstruction
services can be enhanced to examine various cost futures and building
scenarios.
Collaboration in the AEC landscape helps align the
incentives of various individuals viz. contractors, owners, designers,
suppliers, and more. As the uptake of BIM continues in most of the developed
and developing nations, it is imperative for individuals or professionals to
gain a deeper understanding of BIM for the purpose of construction cost and
project management practices.
The adoption of BIM
Preconstruction Services in the US has provided
significant insights whilst using information as the most important tool to
assist in managing the design aspect and construction data as well. Integrating
BIM in the Preconstruction Phase
creates a greater impact on information, expertise, and experience.
Whilst introducing the crucial aspects of BIM in
the early stages of the project life-cycle, it becomes easier for external
parties to understand project scope, scale, clarifications, and the impact on
design, value analysis, phasing and schedule. This makes work for the general
contractor easier, as they are exposed to crucial information in the early
design phases.
Previously, people working in the FM services or Facilities Management Services
or sector were brought in the later stages of the project cycle, but through
BIM, they’ve started to take part in the very early phases of the project life-cycle.
This helps general contractors clarify the scope of work, pull quantities of
materials, and designs to various trade contractors.
In the present scenario, 5D BIM helps architects,
owners, engineers and builders to collaborate at the earliest stages of the
project life-cycle. This could help them evaluate the current design and/or
look at revisions that would affect the project at any stage of the project
life-cycle.
Key
Benefits of 5D BIM are:
High-end predictability with visual and data
modeling. That includes parametric designs, site equipment and conditions,
building materials, phasing, and more
Clear understanding of the proposed design with
precise scope, cost and schedule. This eliminates the element of surprise and
provides decisions that highly accurate
Real-time data modeling for new development or
change
Accurate understanding of the end-product and
deliverables
The construction costs change in real-time wherein
productive and engaging solutions can be derived for a project(s). A virtual
construction planning process identifies key drivers in BIM through advanced
software like Autodesk Revit and Navisworks, this software when integrated with
the BIM helps create smarter decisions and offers a wide range of cost value to
it as well.
Closing
Thoughts
Companies can build smart as many experienced
owners and stakeholders regard BIM
preconstruction services in the US yields
positive outcomes through positive results, error reduction, enhanced planning
and BIM Construction Project Management.